MRP that explodes your BOMs
Run MRP over forecast and orders and get net requirements per material, with a buy or make line for each shortfall.
Vividia Manufacturing connects bills of materials, MRP, production orders, batches, work orders, quality control and cost, with raw materials drawn from IMS stock as production starts.
Orders, materials, batches, inspections and cost share one record, so the plant, the store and the accounts read the same numbers.
Run MRP over forecast and orders and get net requirements per material, with a buy or make line for each shortfall.
Confirming an order checks and reserves stock; issuing a batch draws raw materials from IMS inventory.
QC inspections, pass rates, NCRs, CAPA, compliance registers and quality certificates sit beside production.
Material, labour, machine and overhead are booked per batch, so cost per unit is measured, not estimated.
Each production order shows its BOM, due date, output against plan, batches running and whether materials are ready. A lifecycle tracker moves it from draft to confirmed, in progress and completed, and confirming reserves the stock it needs.
See every order with its status, priority and planned start, with counts for drafts, confirmed, running, completed and cancelled. Confirm, batch or cancel straight from the list.
MRP explodes demand through every level of the bill of materials, nets it against stock, receipts and reservations, and proposes a planned order for each shortfall. Demand forecasting and finite-capacity scheduling sit alongside.
The cost report books material, labour, machine and overhead per batch and works out cost per unit, with variance, BOM cost and routing-step cost reports for deeper analysis.
Record inspections per batch and stage, track pass rate and first-pass yield, raise NCRs and CAPA, and keep compliance registers, quality certificates and labels in the same system.
Start with orders and batches, then switch on MRP, scheduling, quality and cost analysis without moving data.
Production floor, orders, batches, work orders, raw materials and finished products.
Versioned BOMs with components, quantities and units for each manufactured product.
Demand forecast, MRP with planned orders and finite-capacity scheduling.
QC records, templates, stages, NCR, CAPA and root-cause categories.
Compliance register, quality certificates, labels and safety incidents.
Waste with reason codes, scrap trend and traceability reports.
Cost, variance, BOM cost, routing step cost and stock count variance reports.
Efficiency, routing performance, schedule adherence and OEE.
A report hub covering production, quality, materials, planning and facility.
Workspace gives Manufacturing one sign-in, roles and an audit trail across the suite. Raw materials come from IMS stock, and the plant sits alongside ABMS for accounts and HRM for the people on the floor.
See Workspace HubVividia Manufacturing (MOMS) is manufacturing ERP software for factories in Nepal. It connects bills of materials, MRP, production orders, batches, work orders, quality control, waste and cost on one record, and draws raw materials from Vividia IMS stock.
Yes. MRP explodes demand from forecasts and orders through every level of the bill of materials, nets it against stock, scheduled receipts and reservations, and proposes a planned buy or make order for each shortfall over the horizon you choose.
Confirming a production order checks and reserves the stock it needs. When a batch starts, its materials are issued from IMS inventory, so raw-material stock and production stay in step without manual adjustments.
Yes. You can define QC templates and stages, record inspections per batch, follow pass rates and first-pass yield, raise NCRs and CAPA with root causes, and keep compliance registers, quality certificates and labels.
Material, labour, machine and overhead are booked per batch and divided by output to give cost per unit. Variance, BOM cost and routing-step cost reports show where cost differs from plan.
Yes. Finite-capacity scheduling plans work forward over a horizon and can be reviewed as a Gantt, a board or a dispatch list before it is committed to work orders.
Yes. You can start with production orders, batches and BOMs and switch on MRP, scheduling, quality and cost analysis as you grow, without moving data.
Pricing depends on modules, users and plants, so it is quoted after a short demo. Book a demo and we will walk through your own products, BOMs and production flow.
Book a personalized demonstration or start with a general conversation.